SAMC Phase 4 Construction

  • A crane pounding steel beams into sqaure holes in the ground. There are six holes and each have multiple beams driven into them.

    1/23

    In Summer 2018, construction began on the last phase of the Science and Mathematics Complex (SAMC). A crane drove steel beams into the ground for the foundation.

    Download Image
  • A crane pounding steel beams into sqaure holes in the ground. There are eight holes and each have multiple beams driven into them.

    2/23

    In Summer 2018, construction began on the last phase of the Science and Mathematics Complex (SAMC). A crane drove steel beams into the ground for the foundation.

    Download Image
  • A construction site with large square holes with concrete and rebar in them and the beginning of a wall of a foundation.

    3/23

    Next rebar was positioned and concrete was poured to begin to lay the foundation.

    Download Image
  • A construction site through a chain-link fence. The siding has been pulled off an existing building and the forms of new walls and rebar columns rise out of the ground next to it.

    4/23

    The first walls were poured next.

    Download Image
  • Construction workers stand on steel plates placed across the first floor of a building under construction.

    5/23

    When all the walls were up, steel plates were placed on the first floor to continue building upward.

    Download Image
  • Rebar layed out in a grid on the second story of a building under construction.

    6/23

    Rebar was placed in preparation for pouring the second floor.

    Download Image
  • A building under construction with a two story addition with concrete walls and rebar. A fence separates the construction site from the rest of campus.

    7/23

    The second floor walls began to take shape.

    Download Image
  • A building under construction. Struts are being put up on the second floor.

    8/23

    Supports were used to build the ceiling of the second floor.

    Download Image
  • A construction worker supervises as a fork lift places steel plates on the second floor of a building under construction. There is snow on the steel plates that comprise the floor.

    9/23

    Construction continued through the winter, and the third floor began construction.

    Download Image
  • A crane reaches to the top floor of a partially constructed building. There are steel beams, including steel beams in a dome shape.

    10/23

    The planetarium was constructed out of steel beams.

    Download Image
  • A construction site with a partially constructed building made of concrete and steel beams. A concrete truck has a long tall crane arm. Tarps are over part of the building.

    11/23

    Crane arms were used to pour concrete on the higher levels of the new building.

    Download Image
  • Wooden frames and steel rebar form walls and columns on the upper floor of a building under construction.

    12/23

    The third floor begins to take shape.

    Download Image
  • A partially constructed building made of concrete and steel beams . There is a section that is a dome made of steel beams.

    13/23

    The east side of the building is now three levels of steel frame with concrete floors.

    Download Image
  • A three level concrete building under construction.

    14/23

    The west side of the building is now three levels of concrete.

    Download Image
  • A building under construction with a large steel frame surrounding a dome made of steel beams. There is snow on the ground.

    15/23

    Construction crews built a frame around the dome of the planetarium.

    Download Image
  • A building under construction. Part of the building is constructed of concrete while the other part is mainly steel beams.

    16/23

    The southern view shows the connection between the concrete part of the building, the steel part of the building, as well as the already existing part of SAMC.

    Download Image
  • A partially constructed building. The constructed part of the building is steel and glass. The part being built is partially concrete and partially steel. The concrete part has steel beams on the top level.

    17/23

    Steel beams were added to the top of the concrete part of the building to house the HVAC system.

    Download Image
  • A building under construction that partially has walls and is partially steel beams. There are some narrow windows in the walls.

    18/23

    In March 2019, walls began to enclose the concrete part of the building.

    Download Image
  • A hallway with many buckets in it to catch leaks.

    19/23

    Unintended consequences: The third floor had a leaky ceiling near where the construction was happening. Taking the siding off SAMC allowed water to get blown into the ceiling until the two parts of the building were tied together.

    Download Image
  • A concrete ceiling with cracks or staining.

    20/23

    Unintended consequences: The ceiling of the third floor developed leaks during construction, so the ceiling tiles had to be removed until the buildings were tied together and the leaks could be fixed.

    Download Image
  • A partially constructed with metal framing the walls between the concrete floors.

    21/23

    The walls were framed out with metal pieces before the drywall was put up.

    Download Image
  • A partially constructed building that has walls enclosing part of it, a steel frame surrounding a steel globe, and some windows on both parts of the building.

    22/23

    In April 2019, the concrete part of the building was mostly enclosed with walls, and windows started to be put up around the atrium with the planetarium.

    Download Image
  • A partially constructed building. The existing part of the building is metal with many windows. The new part of the building is partially enclosed with walls, but other places are open where large windows later be placed. The walls inside are framed but not built yet.

    23/23

    The west side of the building is still mostly open, but it's beginning to look like the rest of the building, with places for large three-story windows broken up with some metal sections. The walls inside are all framed but there isn't drywall up yet.

    Download Image